Construction plan for navigation facilities of Baise hydropower station
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The maximum navigable head of Baise hydropower station is 113.80 m.The water level of the upstream reservoir varies greatly,while the water level of the downstream Youjiang changes rapidly.The construction of navigation facilities is faced with such technical problems as navigation at high water head,saving water resources and reducing the influence on the safety and operation of the built facilities.The construction scheme should achieve the optimal coordination effect of multiple objectives,such as high-efficient navigation,reliable operation,convenient maintenance and economic investment.For the navigation facilities of Baise hydropower station,the combination of lock and ship lift,ship lift and ship lift,single-stage ship lift and multi-stage ship lock are adopted for technical and economic comparison.The combination scheme of ship lock and ship lift is recommended,which gives full play to the technical advantages of ship lock adaptation to large water level amplitude variation,large lifting height of ship lock and short time for ship lock passage.We compare and select the types of ship lift.The proposed combination scheme of ship lock and fully balanced vertical ship lift can achieve the construction objectives of efficient navigation and reliable operation.This paper puts forward a new idea for realizing high dam navigation,which has positive reference significance for the construction of similar projects and the revision of codes.

    Reference
    Related
    Cited by
Get Citation

姜兴良,汪 磊,刘建超.百色水利枢纽通航设施工程建设方案*[J].水运工程,2024,(5):123-129

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 10,2024
  • Published:
Article QR Code