Management plan for joint operation of LNG double berths in Tianjin Port area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To meet the target of maintaining LNG supply during the winter peak period in northern China,two LNG berths are planned for the same harbor basin in Bohai Sea.In view of the complexity and relevance of LNG ships entering and departing ports under the joint operation of berth groups,it is necessary to study the joint operation and dispatching management of two LNG berths.Taking the first LNG double berth officially put into operation in China as an example,based on the ship maneuvering simulation method,this paper analyzes the influence of LNG ship navigation on the passage capacity of the waterway and the adaptability of adjacent berths,and puts forward the priority of LNG ships in and out of the port under the operation of double berths.On this basis,combined with the characteristics of LNG double berths operation and navigation management rules,the short-term and long-term ship joint dispatching organization model at different stages are formulated.The research results can provide decision-making basis for the navigation management of LNG double berths at a single port site.

    Reference
    Related
    Cited by
Get Citation

李延伟,周瑞赛,王闻恺.天津港大港港区LNG双泊位联合运行通航管理方案*[J].水运工程,2024,(5):42-48

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 10,2024
  • Published:
Article QR Code