Erosion and deposition numerical simulation and engineering scheme optimization of cross estuary of Tongyang Canal and Taidong River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Deposition at cross estuary affects the normal navigation of ships and leads to grounding accidents.In order to make full use of the navigation function of the waterway,it is necessary to analyze the causes of navigation obstruction in time and formulate waterway dredging plans to ensure smooth and safe navigation of the waterway.This study takes the cross estuary of Tongyang Canal and Taidong River as the research area,and establishes a two-dimensional Delft 3D water-sediment model to analyze its sediment movement law and geomorphic evolution characteristics in combination with the actual measurement.Based on different dredging elevation and dredging slope,six channel scale schemes are designed,and through simulation analysis,an optimization scheme that takes into account the navigation safety of passing ships and the economic cost of dredging is obtained.This study can provide reference for the channel scale design and optimization of similar crossing estuaries.

    Reference
    Related
    Cited by
Get Citation

高志峰,冒刘燕,李梦琦,谢 雯,徐宿东,殷 锴.通扬运河与泰东河交叉河口航道冲淤数值模拟及工程方案优化*[J].水运工程,2023,(8):63-69

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 15,2023
  • Published:
Article QR Code