Capacity of existing locks and planning lock in Changzhou Multi-purpose Dam
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    At present,there are four lanes of locks in Changzhou multi-purpose dam.The down bound cargo volume in 2021 reached 119 million tons and was close to the capacity of locks.In the study of scheme for a new lock,the capacity of existing locks and the new lock should be analyzed in accordance with the cargo volume forecast.The formation of vessels through the lock and the average dead weight tonnage and loading rate of each class of vessels are predicted.Based on discrete event system simulation,a model of lock group is built,simulating the random arrival of vessels and ship arrangement algorithm in lock chamber,and considering different ship distribution rules among multi-lane locks.The results show that the total capacity of lock group is relatively optimal if ship enters lock by its arriving order.Besides,the fifth lock should be built at a new location and plane dimension of 340 m ×34 m is suitable for it.

    Reference
    Related
    Cited by
Get Citation

吴 澎,刘春泽,李明泽,高成岩.长洲枢纽既有船闸和扩建船闸的通过能力分析[J].水运工程,2023,(8):56-62

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 15,2023
  • Published:
Article QR Code