Disposal plans for hidden safety hazards of Lianjiang shipping hub
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Most of the existing 10 shipping hubs in Lianjiang,such as Jietan,have exceeded their service life,and there are hidden safety hazards in terms of plane layout,main structure,foundation treatment,and construction quality of buildings.Therefore,this paper proposes disposal plans for hidden safety hazards,including hub scrapping and demolition,reconstruction after risk removal,and unified cascade layout adjustment.Through technical and economic comparison,the paper recommends the unified cascade layout adjustment plan.This plan aims to build a comprehensive hub with navigation as the main function,which also considers power generation,irrigation,water supply,flood control,urban landscape,and other functions,so as to comprehensively utilize water resources and maximize benefits,which can provide a reference for the disposal of hidden safety hazards of hubs in similar rivers in the future.

    Reference
    Related
    Cited by
Get Citation

罗业辉.连江航运枢纽安全隐患处置方案[J].水运工程,2023,(7):169-173

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 13,2023
  • Published:
Article QR Code