    Abstract:

    The statistics of loading overflow construction quantities can include the sand settling in the channel range,while the sand settling outside the channel range cannot be determined.Therefore,the dredging quantities calculated according to the channel volume are much smaller than the actual dredging quantities when the engineering is checked and accepted.Based on the 100,000-ton channel project of Rongxing port area of Panjin Port,we build the tidal current and sand model of the project area by MIKE 3 hydrodynamic numerical simulation software,and calculate the overflow sand loss outside the channel range.The results show that this method can calculate the loss of loading overflow construction in the whole construction period,and it is important for the construction party to count the actual dredging quantities.

    Reference
    Related
    Cited by
Get Citation

赵津京,赵建豪,邬德宇,王天祥.基于MIKE 3模型计算航道工程装舱溢流施工流失量[J].水运工程,2023,(6):215-220

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 13,2023
  • Published:
Article QR Code