Design of special construction scheme of extra-long distance and multi-point filling for cutter suction dredger
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    As port construction,waterway maintenance,island reclamation and other projects continue to move towards the direction of longer blowing distance,harder bottom,larger digging depth and other complex conditions,higher requirements are put forward for dredging equipment selection,technical scheme design and construction organization.Regarding the complex site conditions of Dongying Port approach channel,poor sea conditions,scattered dredging area,long transport distance of dredged soil,difficult cost control and other problems,the comparison and selection of dredging equipment,pipeline redundancy design,transportation capacity calculation and construction combination optimization are carried out for the construction scheme of ultra-long distance multi-point dredging. A set of special combined construction scheme of extra-long distance multi-point dredging for cutter suction vessel is designed,which is technically feasible,safe,environmentally friendly,convenient and economical,and can provide reference for similar dredging and filling projects.

    Reference
    Related
    Cited by
Get Citation

程旭东,廖朝昶,易 伟.绞吸船超长距离多点吹填专项方案设计[J].水运工程,2023,(2):171-175

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 14,2023
  • Published:
Article QR Code