In view of the relative shortage of water resources in the northern region,combined with the Wangdao ship lock project in the Xiaoqing River,the water-saving measures of the ship lock are discussed,and two different plane layout schemes and operation modes of multi-stage water-saving pools with deep and shallow pools and different water deliveries are put forward,namely,single-stage water-saving pools operating alone and single-stage water-saving pools combined with pumping station operation. The following conclusions are drawn from the comparative analysis:1)Both of two water-saving schemes meet the requirements of the specification and water-saving use.2)The multi-stage water-saving tank has a high water saving rate,and the single-stage water-saving tank combined with the pump station has a long water delivery time. 3)The selection of water-saving schemes for similar projects needs to be comprehensively determined in combination with water resource conditions,ship lock throughput capacity requirements,water delivery time,site layout,construction conditions,and project investment.
Reference
Related
Cited by
Get Citation
QIAN Li-hui, JIANG Tao. Water saving engineering measures of Wangdao ship lock in the Xiaoqing River[J]. Port & Waterway Engineering,2022(S1):149-154.