Design and construction points of reconstruction and extension of an old gravity wharf in East Africa
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A hydraulic project in Tanzania is a reconstruction and expansion project. The original pier of the transfer section of berths 3#-4# is a gravity structure and a high-piled,reverse-beam and large-slab structure,which was built in the 1960s. The original gravity structure is retained in the reconstruction and expansion design. The cantilever high-pile cap structure,the high-pile beam plate structure,and the high-pile cap structure are used for mixed structural design to minimize the load acting on the original gravity structure and ensure the stability of the structure. The farthest part of the longitudinal beam on the land side is constructed with miscellaneous filling bottom form,which can reduce the consumption of the support system. The concrete surface layer of the high pile,reverse beam and large slab structure is reserved as the construction platform of the cast-in-place pile steel tube,which can shorten the construction period of the cast-in-place pile.

    Reference
    Related
    Cited by
Get Citation

冯光华,许应杰.东非某水工工程重力式老码头改扩建设计及施工要点[J].水运工程,2022,(6):240-244

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 08,2022
  • Published:
Article QR Code