Determination of underwater piles’ locations and distances by multibeam point cloud
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Due to underwater complex environment,pile inclination and large measurement error,the determination of underwater cylindrical pile position with high accuracy,low cost and high efficiency has always been a difficulty in offshore engineering. Therefore,this paper proposes a high-precision determination method of underwater cylindrical piles and their spacing distances based on MBES(Multi-beam echo sounder)point clouds. Firstly,we has obtained positions of pile and seabed with low cost and high efficiency using this method. Then,considering the geometric information(normal vector and elevation)as well as pile attribute information,we realized the effective extraction of pile point clouds using a comprehensive threshold segmentation method. A comprehensive determination method of pile center position considering pile shape and measurement error has put forward to realize the high precision determination of pile position and pile spacing. The method in this paper has been verified by practical engineering,and the determination accuracy of pile position and pile spacing is better than 5 cm.

    Reference
    Related
    Cited by
Get Citation

夏显文,张小东.基于多波束点云的水下柱桩及桩间距高精度确定方法[J].水运工程,2022,(1):41-46

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 04,2022
  • Published:
Article QR Code