Construction organization and management of super-large scale earthwork project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To solve the problem of the large-scale earthwork construction organization management with difficulty and high intensity,we carry out the management overall the technology,quality,progress,and cost control in the construction process. Relying on the reclamation project of Daxiaoyushan,we analyze the key points and difficulties in each stage and aspect in the construction process of the super-large scale earthwork project and make a targeted solution. Through the whole process control of planning,paying attention to details,strengthening the pre-planning,in-process control,and post-analysis,we propose the new management methods in quality,progress,safety,contract cost,measurement,etc.,finally achieve the balance of stone supply and demand.

    Reference
    Related
    Cited by
Get Citation

方后春,邹俊飞.超大规模土石方工程施工组织与管理[J].水运工程,2021,(5):56-60

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 12,2021
  • Published:
Article QR Code