Design optimization of drainage system for new coal terminal of power plant in Vietnam
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to meet the development needs of local power,Vietnam plans to expand the coal-fired power plant and builds a new coal terminal and coal conveying system. In view of the design scheme for the drainage system of the new coal terminal provided by the foreign party,we carry out a comprehensive analysis from the technical and economic point of view,and point out the shortcomings of the drainage system designed by the foreign party. Combining with the common practice of the drainage system of the coal terminal in China,and based on the comparative analysis,we optimize the drainage system designed to meet the environmental protection requirements of “zero discharge” of rainwater and flushing wastewater in the terminal area.

    Reference
    Related
    Cited by
Get Citation

李华平,汪 莲.越南某电厂新建煤码头排水系统设计方案优化[J].水运工程,2020,(5):163-167

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 18,2020
  • Published:
Article QR Code