Key points of general layout and handling process design for ABU Dhabi Khalifa Port Container Terminal Phase II
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    ABU Dhabi Khalifa Port Container Terminal Phase II is an important node project of “One Belt and One Road”.According to the requirements of the construction of automated container terminal,the paper studies the selection of automated mode and the general layout & handling process.By comparing the automation level,traffic organization,yard capacity,personnel investment,construction period,project investment and other aspects,the automated terminal mode (ARMG & tractor trailer) with yard paralleled to jetty apron is selected.The yard capacity can be expanded by intensive arrangement of auxiliary facilities and back-to-back arrangement of single cantilever ARMG.The reliable,advanced,expansible technology of the project shorten construction period and reduce project investment.

    Reference
    Related
    Cited by
Get Citation

唐 洲,葛 斌,张 超.阿布扎比哈里发港集装箱码头二期项目平面工艺设计要点[J].水运工程,2020,(5):105-110

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 18,2020
  • Published:
Article QR Code