Searching for overseas project quality management methods
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combining two-year project management practices of construction of Abu Dhabi Khalifa Port Container Terminal Phase II Project,which is an important “the Belt and Road” project between China and the United Arab Emirates (UAE),and seizing the opportunity of working with the internationally famous consultant JACOBS for providing high-level consulting & project management services for the project,we study the project quality management methods from three aspects including pre-construction control,in-process management and post-construction summary,so as to provide reference for the domestic engineers to attend the overseas project management.The study mainly focuses on the overseas project quality management method which are obviously different from those in China.By the analysis and comparison method,we summarize the good material quality management method MAR and construction quality management method WIR which emphasizes the process control & record,and plan to introduce them to the domestic project quality management work in China later to help improve the domestic project quality management level.

    Reference
    Related
    Cited by
Get Citation

张崇宏,章 沛,吴恩朝.境外工程项目质量管理方法探索[J].水运工程,2020,(5):47-50

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 18,2020
  • Published:
Article QR Code