Design and utilization of temporary steel sheet pile jetty
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the problems of poor geological conditions,tight construction period and budgetary constraints of temporary wharf area,we analysis and research the temporary wharfs with different structural forms in Penang Drainage Filling STP2 Project,Malaysia.Then we select one of the temporary steel sheet pile wharf structures,which adapts to harsh geological conditions,is simple and fast in construction,and has low cost.The design achieves good construction effect,meets the needs of the project,and has certain popularization significance.

    Reference
    Related
    Cited by
Get Citation

陆 阳,尹海涛.临时钢板桩码头的设计与应用[J].水运工程,2019,(S2):91-94

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 14,2019
  • Published:
Article QR Code