    Temporary cofferdam is needed to stop water and dewatering during the construction of the outlet cofferdam in the D section of the second phase extension project of Guangxi Qinzhou power plant,so as to obtain the dry construction conditions.After scheme comparison and optimization,scientific calculation and reasonable demonstration,the combined structure of filling sand bag,jet grouting piles,steel sheet pile,cast-in-place pile,brick water-stop wall,water-stop ring beam and water-stop clay wall is adopted.Based on the characteristics of different water-stopping structures,the structures of cofferdams in water area and land area under different environmental conditions are optimized and designed reasonably,which effectively solved the construction difficulties such as small local space and large head difference,and achieved good engineering results.This method has certain reference value in the design optimization and selection of similar projects.

    Reference
    Related
    Cited by
Get Citation

陈宝明,王其力,薛春刚.电厂排水口围堰设计与施工[J].水运工程,2019,(S1):105-110

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 15,2019
  • Published:
Article QR Code