Application of BIM forward design in inland waterway dredging engineering
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the lack of information transfer among the traditional design processes of inland waterway dredging engineering,we propose the BIM forward design idea of inland waterway dredging engineering through comprehensive analysis of the Civil 3D characteristics and special requirements of design,establish the BIM forward design method of inland waterway dredging engineering based on Civil 3D,and improve some of the functions of dredging engineering quantity output and batch drawing during the design processes through secondary development.The results show the BIM forward design method is applied to the dredging project of Modaomen waterway,which effectively improves the design efficiency.It can provide references for the similar projects.

    Reference
    Related
    Cited by
Get Citation

李 锐,李 正,王 飞. BIM正向设计在内河航道疏浚工程中的应用[J].水运工程,2019,(12):123-126

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 09,2019
  • Published:
Article QR Code