Real-time broadcast system of coastal long-distance tide in H1.2 standard section of Lianyungang 300,000-ton waterway phase II project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the long channel,offshore distance and the problem that a single tide station is difficult to control the real-time tide level of all construction sections for the 300,000-ton waterway phase II project waterway dredging construction project in Lianyungang Port LYG-302-H1.2 section,we carry out a systematic development & research.Using the original three tide stations for tidal level correction,and adopting Beidou information transmission system,we study the relevant software and obtain a set of long-distance tide level real-time broadcast system suitable for the project.The comparison between the field-measured data and the data calculated by the corresponding base station shows that the system can be used in the project.This system is connected to the ship dredging system to provide real-time tide data for the construction ship,and the construction ship completes the ship's definite depth on this basis,which plays an important role in the quality control of the project.

    Reference
    Related
    Cited by
Get Citation

赵 贤,肖 东.连云港港30万吨级航道二期工程H1.2标段沿海远距离潮位实时播报系统研究[J].水运工程,2019,(11):114-117

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 14,2019
  • Published:
Article QR Code