    Abstract:

    The layout of the second-line ship-lock always needs adjustment because of the existing buildings,land resources,etc.Based on the Dongdaying Port ship-lock engineering,we study the surrounding environment conditions,construction conditions,environmental protection requirements,and utilization conditions,point out the shortage of the original design,and put forward the optimization approaches including the use of the high pile cap forked revetment structure in outer river approach channel,high pile abutment separates diversion dike structure in the outer river diversion dike,the SWM method in the lock chamber construction foundation pit,etc.,by which,we solve the technical problems of building second-line ship-lock under the condition of limited space,shortage of resources and strict requirement of environmental protection.

    Reference
    Related
    Cited by
Get Citation

刘术俭,隗祖元,顾宽海,汤丽燕.上海东大盈船闸工程结构设计优化与创新[J].水运工程,2019,(10):154-158

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 14,2019
  • Published:
Article QR Code