Integrated design and construction of water intake and revetment engineering
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For LNG projects with land reclamation under deep sea conditions,enclosure and revetment are usually implemented first,then reclamation and foundation treatment are used to form land area,and finally the prefabricated structure of intake is excavated and embedded.This construction process has resulted in long construction period,high cost,no environmental protection and other issues.The integrated design and construction of intake and revetment engineering are realized through BIM collaborative design,early determination of functional parameters of intake and reasonable adjustment of construction process.The integrated design and construction not only guarantees the quality,safety,environmental protection and progress,but also achieves good economic and social benefits,which can provide reference for similar projects in the future.

    Reference
    Related
    Cited by
Get Citation

武 警,侯 勇,洪 亮,杨 彪,李达华.取水口与护岸工程一体化设计与施工[J].水运工程,2019,(9):327-329

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 16,2019
  • Published:
Article QR Code