Main geotechnical problems of second-line shiplock project of Mengli Junction in Beijiang River of Guangdong Province
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The second line shiplock of Mengtli hydroproject in Beijiang River of Guangdong Province situates in a mixing zone with carbonaceous limestone,carbonaceous shale and siltstone,limestone interbedded and soft rock & intensive karst zone developed.In view of the stability of deep foundation pit,stability of excavated slope higher than 60 m,karst treatment,we propose reinforcement measures and construction techniques for the trench of the earth wall,and adopt a new type of wall cofferdam structure in the lower part of the wall and upper retaining wall,which effectively reduces the backfill,excavation and internal force of the construction platform,and meanwhile provides a reliable basis for optimizing the foundation pit construction plan and lays a solid foundation for ship lock construction.

    Reference
    Related
    Cited by
Get Citation

林剑锋,张 明,程新生.广东北江濛里枢纽二线船闸工程主要岩土问题探讨[J].水运工程,2019,(6):167-171

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 12,2019
  • Published:
Article QR Code