Abstract:A wharf project in East Africa is built with three berths.The high pile-beam structure is adopted.The center of the track beam at the front of the pier is 4 m from the foreline,and the overhang is large.The steel hoop and I-beam are used as the support system.During the process of concrete pouring,the settling data of the frontier line is larger than the theoretical value,and the maximum settlement of the frontline is 60 mm.In order to control the settlement,we piece the ribbed panel together with No.45 I-beam as the support system,and combine with the steel pipe pile top 25 mm rebar.The settlement of frontier line is reduced to less than 10 mm by this measure.The scheme is convenient and helpful to the project quality and construction period,which can provide the reference for the similar projects.