Yard modification effect for existing rain water drainage pipeline in Abu Dhabi port
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    An Abu Dhabi port is proposed to modify existing container yard layout form according to its own development needs.The large live load is applied to the constructed rainwater drainage pipelines after reconstruction project.This paper analyzes that whether the rainwater drainage pipelines are damaged or reinforced after reconstruction project,and apply the American standard to calculate and check for GRP pipes deflection deformation.According to the calculation results,the existing GRP pipes can meet the demand of the yard after transforming except any reinforcement measures.

    Reference
    Related
    Cited by
Get Citation

李华平.阿布扎比某港堆场改造对已建雨水管的影响[J].水运工程,2019,(2):77-80

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 30,2019
  • Published:
Article QR Code