Settlementcal culation of sand foundation on land reclamation project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For more and more ground settlement problems in large scale land reclamation projects,the paper has studied an often used settlement calculation method-De Beer method.Through the in-situ test data of support project,the parameters of De Beer calculation method has been studied,and an appropriate settlement calculation method has been obtained.At last,through the comparison of the predicted settlement of the measured data in site,the calculation method and process mentioned have been proved to be useful for settlement calculation in large scale land reclamation projects.

    Reference
    Related
    Cited by
Get Citation

梅涛涛,王 新,何丽平.吹填造陆工程砂土地基沉降计算[J].水运工程,2018,(12):198-201

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 11,2018
  • Published:
Article QR Code