Cause analysis of siltationin navigation channel in Nantong waterway
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the rapid increase of siltation in navigation channel in Nantong waterway,we analyze the intrinsic and external factors of siltation by the combination of measured data and mathematical model.The results show that,the dynamic is dispersed and weakened as the width of Nantong waterway widening from 2 km to 6 km,then sediment deposite and shoal underwater is formed,and the shoal underwater is transported crossing the navigation channel under the influence of circulation flow.The Hutong Yangtze River Bridge and the Tongzhou shoal west channel regulation are the direct causes of the rapid increase of siltation in navigation channel.The abundant sediment scour from Fujiang shoal waterway provides part source of siltation in navigation channel.

    Reference
    Related
    Cited by
Get Citation

贾雨少,谢 婕.南通水道航道回淤原因分析[J].水运工程,2018,(12):147-154

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 11,2018
  • Published:
Article QR Code