Feasibility study on opening emergency sub-waterway in the left channel of Zhongshuiqi in Changshou waterway of the Three Gorges Reservoir area
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To counter the problem of serious ship backlog and low efficiency in Wangjiatan of Changshou waterway during the late falling stage,we carry out a feasibility study on opening emergency sub-waterway in the left channelof Zhongshuiqi.Based on the analysis of fluvial process and status of channel conditions in Wangjiatan,it is concluded that by removing some of Zhongshuiqi and exploding part of the Niuleiba reef,the current situation of channel bending and poor flow conditions of Chaipanzi in the left channel of Zhongshuiqi can be improved.After implementation of the project,the emergency sub-waterway is maintained when the local water level is 151.0~155.0 m(at the late falling stage and flood season).The maintenance dimension of channel is 3.0 m×50 m×560 m.

    Reference
    Related
    Cited by
Get Citation

刘辛愉,王艳芳,苏 丽,王 涛.三峡库区长寿水道忠水碛左槽应急副航道开通可行性研究*[J].水运工程,2018,(11):120-125

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 09,2018
  • Published:
Article QR Code