    According to the factors such as hub scheduling and artificial sand excavation after Xiaoxitan hydropower station is built,the characteristics of water and sediment,and river level and discharge are changed.Combined with the engineering arrangement of diversion embankment,we carry out the condition analysis and rechecking of the downstream navigation flow under the changing terrain conditions.Using numerical simulation method,we establish a numerical simulation model of two-dimensional hydrodynamic hub downstream,optimize diversion dike layout and the size parameters by numerical calculation and program results,and put forward the hub downstream approach channel of diversion dike layout suggestions,which can meet the requirements of the navigation flow conditions change terrain conditions.It also can reduce the influence of the original design scheme on the flood discharge capacity of the river.

    Reference
    Related
    Cited by
Get Citation

郑星伟,张 铭,范洪浩,余春辉,兰林峰.小溪滩枢纽下游导流堤布置及形式优化*[J].水运工程,2018,(9):96-100

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: September 14,2018
  • Published:
Article QR Code