International environmental protection management practice for Dubai Hassyan power plant terminal facilities and GRP pipeline project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Dubai Hassyan power station jetty and GRP intake and outfall pipeline EPC project,lies in Jebel Ali Wildlife Sanctuary(JAWS),and Dubai Government raises a very high and unique environmental protection standard for construction within this sensitive ecological area.The environmental protection commitment that could satisfy Dubai Government is one of key pre-conditions that decides whether the permission to start the project was granted.The following questions are explained:in the case that there is no similar experience around the project territory for reference,from the project survey and design to the construction phase,we actively explore and solve the problems of the various environmental and ecological protection,and ultimately obtain CEMP related environmental protection documents of approval from the local government.And how we implement the environmental protection measures required by the Dubai government before and during the construction of the project.

    Reference
    Related
    Cited by
Get Citation

JIANG Jun-bo, ZHANG Qing. International environmental protection management practice for Dubai Hassyan power plant terminal facilities and GRP pipeline project[J]. Port & Waterway Engineering,2018(8):205-208.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 13,2018
  • Published:
Article QR Code