Abstract:Taking the pier and storage yard design of a port on the Yangtze River in Jiangsu Province for example,we introduce the main method of integrating energy conservation and efficiency measures into the design of pier.In the handling process,we adopt the frequency conversion linkage system which connects the loading machine,the feeding machine and the belt,rotary transition belt and three-station head telescopic device.For the structural design,a new patent is applied to the land track foundation.As for the electrical design,we use the wind solar street lamps and the shore power system.All measures taken result in a rational project with remarkable benefits.