Experiment on grading adjustment for quarry run of deepwater breakwater
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The quarry run quality is difficult to meet the requirements of the contract and technical specification because of the increase of fine content caused by high quarry run stock, so we strengthen the source control of the quarry run to meet the grading requirements. To minimize sieve quantity of quarry run on site, and ensure the construction progress of breakwater, we verify the section model test through setting the middle layer and adjusting the grading of the guarry run to provide a technical support for the breakwater engineering.

    Reference
    Related
    Cited by
Get Citation

李春潮,邓 涛.深水防波堤堤心石级配调整试验[J].水运工程,2018,(7):77-80

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2018
  • Published:
Article QR Code