Comparison and selection of lifecycle proposal of offshore large-scale crude oil terminal’s marine structure
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The offshore large crude oil terminal project is generally located in the open sea with large waves and water depth,and the wharf is mostly butterfly.The pier foundation type is multiple selection and complicated,and the construction is difficult.Taking Yangpu 300,000 ton crude oil terminal and transportation facilities project in Hainan Province as an example,this paper introduces the structure selection of offshore large-scale crude oil terminal’s marine structure on cohesive soil.It also demonstrates the lifecycle proposal for the high-pile pier foundation and caisson pier foundation in aspects of structure design,durability design,construction technology,later maintenance and cost.

    Reference
    Related
    Cited by
Get Citation

任志杰.外海大型原油码头结构全寿命方案比选[J].水运工程,2018,(7):65-69

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2018
  • Published:
Article QR Code