Environmental protection practice for the second phase of 12.5 m deepwater channel in the Yangtze River below Nanjing
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the variety of aquatic organisms in the 12.5 m deepwater channel in the Yangtze River below Nanjing,how to effectively control and alleviate the adverse effects on the environment during the construction of the channel project is a new subject in front of the builders of the deepwater channel.For this,in the second phase project of the 12.5 m deepwater channel in the Yangtze River below Nanjing,we research and development the new ecological structures of the renovation of the building,strengthen the site monitoring,implement the supervision system,set up the downtime and eco-compensation,which have gained useful practice and exploration,as well as achieved remarkable results in the environmental protection construction.It can provide reference for other projects.

    Reference
    Related
    Cited by
Get Citation

金震宇.长江南京以下12.5 m深水航道二期工程环保实践[J].水运工程,2018,(7):16-19

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2018
  • Published:
Article QR Code