Optimization design of a coal terminal upgrade program
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper has discussed difficult construction and other issues in the reinforcement scheme for traditional high-piled pier wharf,and puts forward a new scheme in which a flexible structure is constructed in front of the pier to bear additional loads.The advantages and disadvantages and adaptability of this new scheme with flexible clustered fender piles in front the pier have been analyzed from aspects of safety,applicability,economy and construction convenience.

    Reference
    Related
    Cited by
Get Citation

周远方,陈 新.某煤码头升级改造方案优化设计[J].水运工程,2018,(2):69-73

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 09,2018
  • Published:
Article QR Code