Throwing construction technology of tetrahedron permeable frame group
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To counter the problem of uneven distribution and safety risk of artificial throwing in the Jingjiang reach channel regulation project in the middle reaches of the Yangtze River,a special throwing hanger is designed.The construction adopts group throwing technology which can control the splash of pervious frame and guarantee the accurate positioning and even throwing.Meanwhile,it avoids the personnel or deck operation which are needed in the traditional construction,and thus reduces the safety risks during construction.

    Reference
    Related
    Cited by
Get Citation

李 平.四面六边透水框架群抛施工工艺[J].水运工程,2017,(S2):24-27

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 17,2017
  • Published:
Article QR Code