Prevention and remediation of common quality defects existed in dredging works
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Referring to Phase I project of 300,000 DWT navigation channel to Lianyungang Port,we analyze the causes from the aspects of external factors,human factors,technical factors and management factors in view of the common quality defects existed in dredging works,and put forward the preventive measures such as increasing the equipment input,innovating dredging technology,adjusting construction plans,strengthening personnel training and project management,etc.Good results are achieved in the Phase I project of 300,000 DWT navigation channel to Lianyungang Port.

    Reference
    Related
    Cited by
Get Citation

王玉东,于康康,沈徐兵,郭冬冬.航道疏浚工程质量通病影响因素与防治措施[J].水运工程,2017,(11):201-204

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 17,2017
  • Published:
Article QR Code