General layout of shiplock in Xiajiang hydro-junction and optimization of lock chamber
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Xiajiang hydro-junction is located at the upstream of Baqiu town in Xiajiang county,Ganjiang river’s midstream. It’s difficult to put the approaching channel of shiplock at such a slightly curved reach when the shiplock is on the left side.There are many factors influencing the flow conditions of the approach channel and entrance area,such as the baffle wall,topographical condition of site,etc.The lock chamber was originally designed as a separated structure which is commonly used,but it must be changed when there is a large-scale faults.Some methods are adopted to make the navigation flow conditions better,and the integral structure is used in the lock chamber by finite element analysis.

    Reference
    Related
    Cited by
Get Citation

罗少桢,韩巍巍,汤建宏,袁和平.峡江枢纽船闸平面布置及闸室结构优化[J].水运工程,2016,(S1):89-93

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 18,2016
  • Published:
Article QR Code