Abstract:This paper expounds the construction technique of post trenching,interlocking mattress at the suspended area,and clearing of sand bags concrete chain row and sandbags removal for the pipe sinking across waterway for subsea pipeline hazard remediation engineering,analyzes the safety risks of waterway-crossing contruction,and discusses the influence of the anchor position on the waterway,so as to take targeted prevention and emergency measures.