Abstract:During installing C-plastic drainage boards under Donghai bridge in Yangshan deepwater habor Phase IV eastern cofferdam engineering,the traditional plastic drainage board crawler installing machine is renovated and the installing technique is innovated,which results in the successful installation of plastic drainage boards using double casing pipes within the limited clearance under the bridge,and both the installing depth and construction quality satisfy the design requirements.