Application of overflow through intentional overloading in waterway dredging project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The overflow through intentional overloading is the most common construction method adopted in the trailing hopper suction dredger (TSHD).It can improve the loading density of dredger,which will lead to a higher dredging efficiency and lower dredging cost.According to the construction characteristics of the overflow through intentional overloading and the regular pattern of sedimentation movement of the solid particles in the liquid,we analyze the applicability of this method in the waterway dredging projects based on the actual projects.

    Reference
    Related
    Cited by
Get Citation

郭飞燕,李 军,谢丽娜,刘东征.装舱溢流施工在航道疏浚工程中的应用[J].水运工程,2015,(7):187-189

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: July 15,2015
  • Published:
Article QR Code