Application of SMW method cut-off wall in dock engineering
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    As a key part in dock engineering,the cut-off wall is the foundation to make sure that dock can be operated safely against water.The choice of the kind of cut-off wall impacts tremendously the dock quality and project cost.Normal cut-off walls have certain flaws such as high price of the steel sheet pile,many leaks of high-pressure jet grouting pile,etc.So,it is imperative to research and apply new-type curtain walls.This paper describes the first application and construction effect of SMW method cut-off wall used in dock wall and foundation pit of dock head,which may serve as reference for similar engineering.

    Reference
    Related
    Cited by
Get Citation

黄振瑜. SMW工法止水帷幕在船坞工程中的应用[J].水运工程,2015,(4):205-208

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 14,2015
  • Published:
Article QR Code