On side load reduction factor under floor-reserved wide seam
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During construction lock chamber floor,in order to reduce floor internal force and avoid the generation of cracks,we usually set up wide construction joints.The floor internal force is with the emergence of the foundation settlement deformation,and the foundation deformation process is a consolidation process related to time.The permeability coefficient of consolidation settlement speed depends on the foundation of drainage and soil conditions.We study the lock chamber the Biot consolidation theory in different foundation natures and the settlement process under different loading ways,and get the internal forces under different conditions.Comparing with the internal force under the method of linear elastic slab,we determine the reasonable side load reduction factor.

    Reference
    Related
    Cited by
Get Citation

王雪军,秦忠国.底板预留宽缝情况下边荷载折减系数的研究[J].水运工程,2015,(1):145-148

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 16,2015
  • Published:
Article QR Code