New method of settlement calculation for drainage reinforcement of dredged sludge
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the large area enclosed land reclamation project,with the development of construction technology,the use of dredged sludge as filler gets a lot of applications.But the corresponding settlement calculation can not meet the actual needs,and the estimated settlement amount only by virtue of experience.Using the two-phase of saturated soil’s water and soil properties,we calculate further the amount of soil subsidence and obtain the settlement formula by calculating the change in the moisture content of the soil before and after reinforcement,which is validated by actual project’s settlement monitoring data.

    Reference
    Related
    Cited by
Get Citation

郑新亮,武 霄,陈允进.吹填淤泥排水加固沉降计算的新方法[J].水运工程,2014,(8):159-162

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 14,2014
  • Published:
Article QR Code