Quality control of explosive compaction engineering in Lianyungang port 0.3 million DWT waterway engineering phase I project
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During implementation of explosive compaction of embankment, people usually rely more on the experience and lay less stress on the analysis and research on the project. Taking Lianyungang port 0.3 million DWT waterway engineering phase I as an example, this paper summarizes the supervision control method for the explosive compaction based on the analysis of the test on typical section, regulation of the construction manners and determination of the inspection means, so as to guarantee the effect of explosive compaction and achieve the target of A for the engineering quality. It can provide a reference for similar engineering supervision work.

    Reference
    Related
    Cited by
Get Citation

芮永强,王健祥,孙雨涵.连云港港30万吨级航道一期工程爆破挤淤质量控制方法[J].水运工程,2013,(10):239-243

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 21,2013
  • Published:
Article QR Code