Numerical modeling of influence on current due to reclamation in Meishan
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Due to the absence of the ground resource, the construction land of the general aerial industry base is planned to get from reclamation in the east of Meishan to construct infrastructures in order to satisfy the functions planning of Meishan. We use the MIKE 21 HD model to simulate the influence on current due to the planned five different reclamation scenarios in the east of Meishan after plugging the Meishan waterway, and make a comparison according to the modeling results. The modeling results reveal that the influence of the planned reclamation project to the larger area tide field is little. Generally speaking, the influence of the first scenario is the least as its reclamation area is the least among the five scenarios. While the fifth scenario has the least influence on the south Chuanshan operation area, as the waterway between Pusheshan mountain and Meishan is not plugged.

    Reference
    Related
    Cited by
Get Citation

杨春平,姜大荣,徐 锟,孙平锋.梅东浅滩围垦对水流影响的数值模拟[J].水运工程,2013,(10):12-18

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: October 21,2013
  • Published:
Article QR Code