New thought of physic model test and result study on immersed tube tunnel element construction
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The force and motion response of the immersed tube tunnel element aren important parameters of immersed tunnel construction. The immersed tube tunnel element that deposit, float and sink to the sea bed is the world’s longest and widest immersed tunnel. We can’t calculate it accurately using the computational structural mechanics and the computational fluid dynamic. In order to study the hydrodynamic behaviors of element during its construction, we carry out a scaled model test to investigate the motion responses of the tunnel element in the immersion under wave and obtain current actions and tensions acting on the controlling cables of its immersing system based on the similarity theory, which may serve as a basis for the key parameters in the numerical simulation analysis, and a guidance to the construction of the immersed tunnel.

    Reference
    Related
    Cited by
Get Citation

梁邦炎,卢普伟.沉管隧道长大管节海上施工物理模型试验思路与结果分析*[J].水运工程,2013,(6):170-176

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 19,2013
  • Published:
Article QR Code