Abstract:The effect of river-crossing bridge on waterway upgrading is analyzed based on the construction of Xiangjiang river 2000 t downstream channel and a concept is proposed that for those bridges with insufficient clearance, treatment scheme which guarantees the navigation safety and also takes the economic feasibility of waterway upgrading into consideration, shall be determined by considering the days of navigation obstruction analyzed based on the existing ship-type and the difficulty of bridge reconstruction.