On scale of anchorage in front of Three Gorges dam
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Due to the bad weather, large flow in flood season, and maintenance of lock, a large number of ships wait lockage at the Three Gorges dam, and the berth of anchorage faces a serious shortage. This paper establishes queuing models of anchorage by the queuing theory to evaluate the scale of anchorage on the basis of statistics, which provides a reasonable basis for the study on the construction scale of the anchorage of the Three Gorges.

    Reference
    Related
    Cited by
Get Citation

张 毅,解中柱,朱俊风.三峡坝上待闸锚地建设规模探讨[J].水运工程,2013,(3):148-152