Dealing with the root of spur dike at gravel bed in Yibin-Chongqing reach of the Yangtze River
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking Guandaoqi beach as a study case, this paper analyzes the damage causes of the root of spur dike on gravel bed, and proposes corresponding repair measures. The analysis indicates that we shall not only ensure the dike root embedded into the initial landform by foundation trench, but also take other measures such as slope protection or stop protector to protect the dike root.

    Reference
    Related
    Cited by
Get Citation

朱俊凤.长江宜宾至重庆卵石河段丁坝的坝根处理[J].水运工程,2013,(2):157-159

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 27,2013
  • Published:
Article QR Code