Utilization of tide-bound water level of 12.5 m deepwater channel phase I project of the Yangtze River downstream Nanjing
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The section of Yangtze River downstream Nanjing, where the 12.5 m deepwater channel phase I project is located, is a tidal reach, and ships with a tonnage over 50 000 need to pass in and out by tide. Based on the tidal characteristics of the engineering river reach, the duration by tidal current and the tide-bound water levels are analyzed under conditions of different guarantee rates of first and second tide saving time, from Tiansheng Harbor of Nantong to the Yangtze estuary. Furthermore, the guarantee rate for navigation of container ship, crude oil ship, bulk carriers of different tonnage, and the rationality of the navigation standard of phase I project are demonstrated.

    Reference
    Related
    Cited by
Get Citation

佘俊华.长江南京以下12.5 m深水航道一期工程乘潮水位利用分析[J].水运工程,2013,(2):1-4

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 27,2013
  • Published:
Article QR Code