Construction technique for perforation’s plugging and caisson’s launching and placing
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The manufacture, launching and placing of ultra-large perforated caissons are great challenges for the construction equipment and technique. Taking caissons of berth No.4 on the north pier of Dongjiakou area Qingdao port as an example, this paper presents the perforation plugging technique of suspended steel formwork, which recovers the shortage of conventional plugging methods. With this new technique, perforations on the midfeathers could be left unplugged and caissons can be placed at high tide. Moreover, the paper introduces the calculation and key construction technique in the launching and placing process of perforated caissons. The successful practice of the project provides a reference for the launching and placing process of ultra-large perforated caissons.

    Reference
    Related
    Cited by
Get Citation

李福文,任志杰.消浪孔沉箱的开孔封堵、溜放与安装施工技术[J].水运工程,2012,(8):191-194

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 22,2012
  • Published:
Article QR Code